Gas Transit to Armenia Resumed
23 May, 2014
Natural gas transit to Armenia which was suspended on May 17, has been resumed.
Emergency brigade of the trunk pipeline operator-Georgian Gas Transportation Company completed repair works on 1200 mm North–South main gas pipeline which was significantly damaged due to the landslide in the Dariali Gorge. Therefore, gas transportation to Armenia is currently resumed.
Suspension of gas transit to Armenia did not affect gas supply of Georgia.
Emergency brigade of the trunk pipeline operator-Georgian Gas Transportation Company completed repair works on 1200 mm North–South main gas pipeline which was significantly damaged due to the landslide in the Dariali Gorge. Therefore, gas transportation to Armenia is currently resumed.
Suspension of gas transit to Armenia did not affect gas supply of Georgia.